BILD 361 Project Management Assessment 2 (2026): BIM Residential Project Management Plan
| Course Code | BILD 361 Project Management |
| University | Victoria University of Wellington (Te Herenga Waka) |
| Assessment | Assessment 2: Project Management Plan (individual), 50% of the course grade |
| Word Count | 3,000 words (excluding references and appendices) |
| Due Date | 19 October 2026, via Nuku |
| Software | MS Project or other planning software (Primavera), Navisworks Manage, PlanGrid, Revit BIM model |
| Referencing | APA 6th edition |
Assessment 2 in BILD 361 moves from the Assessment 1 project management essay to a practical project management plan for a BIM residential project on an allocated Wellington site. Acting for VIC Construct (VICC), students build schedules and cost breakdowns in planning software and Navisworks, raise an RFI in PlanGrid, and write a report explaining why their schedule and communication approach are good.
Course Learning Outcomes
- CLO 1: Understand basic project management systems and their impact on a company and/or project.
- CLO 2: Understand the principles of managing time, cost and quality aspects of a project.
- CLO 3: Take a leadership role in team situations and negotiations by implementing the company’s goal.
- CLO 4: Plan and execute long-term plans in accordance with upper management.
- CLO 5: Understand the basic relationship between market and construction companies.
Assessment Context
The brief sets the scene with global construction growth forecasts to 2030, the pandemic contraction in non-residential building work, long-standing sector problems (low labour supply, weak procurement, low productivity, consenting delays, cost overruns, limited technology training, poor Treaty relations and low quality) and the growing challenge of natural disasters and post-disaster reconstruction. Building on the record of your Assessment 1 essay for VICC, a project management company formed by VUW, you are now asked to deliver a project management plan for an alternative residential project using the BIM drafts shared with you through PlanGrid.
Assessment Task
Reflect on and apply key skills from the previous essay, such as resource, risk and supply chain management, to develop a project management plan that includes, but is not limited to:
- A project schedule plan in MS Project or other planning software.
- A detailed cost breakdown from the MS Project Cost Report.
- A project schedule using Navisworks Manage.
- A detailed cost breakdown from Navisworks Manage.
- A request for information (RFI) and response in PlanGrid.
- A report explaining what you did to create the schedules, mark-ups and RFI, and why you consider the result a “good” schedule and good communication.
The government has earmarked 24 sites across Wellington, each with a BIM model, for these projects. Pay particular attention to project management communication quality, scheduling strategy, cost alternatives, delivery innovations and other construction challenges, and show how your schedule is informed by your Assessment 1 experience. You are assessed on project management, not building design. Few details are available at the feasibility stage, so state your assumptions clearly.
Submission Requirements
- Submit via Nuku on 19 October 2026; do not email the assessment to the coordinator or tutor, and keep a backup copy.
- Submit the report as one PDF, with the project files in Revit (.rvt), Primavera (.xer) and Navisworks (.nwd) formats.
- Include footers with your name and student ID, and name the file BILD361_AS2_SurnameFirstname.pdf.
- Edit for spelling, grammar and clarity; marking stops at the 3,000-word limit (references and appendices excluded).
- Follow APA 6th referencing and the detailed marking criteria and plagiarism rules on Nuku.
need help with your bild 361 project management plan?
Hire NZ Native Experts 24/7.
BILD 361 Assessment 2 is marked on project management judgement, so the software outputs only score well when the report explains them. A strong plan sets a clear work breakdown for the allocated BIM house, links tasks logically so the critical path is believable, loads resources and costs consistently between MS Project or Primavera and the Navisworks 4D/5D model, and uses the PlanGrid RFI to show how a real design gap would be raised and closed. The written part should then justify why the schedule is "good", tie choices back to the risk and supply chain lessons from Assessment 1, and list feasibility-stage assumptions. Our project report writing help and VUW assignment help can guide you on structure and justification. Compare the earlier BILD 361 Assessment 1 essay brief or the SARC 321 Assignment 3 programme and logistics brief.
- SARC 321 Construction Assignment 3 2026: Envelope, Gantt Chart and Site Logistics Plan | Victoria University of Wellington
- LAWCOMM 782 Trade Mark Practice Letter of Advice 2026 | University of Auckland
- LAWCOMM 795 Copyright and Design Final Assessment 2026 | University of Auckland
- BSNS5202 Advanced Business Information Assessment 3, 2026 | Open Polytechnic
- BSNS5203 Applied Business Technologies Assessment 2, 2026 | Open Polytechnic
- CONS7822 Industry Project Part 2 Assessment 4 – Final Report 2026
- HEAL865 Health Research Design and Planning Assessment 2, 2026
- EDU618 Professional Practice 2b Practicum Assessment 1, 2026
- ACCTG 211 Financial Accounting Assignment 4, 2026 | UOA
- STATS 330 Statistical Modelling Assignment Question 2026