| University | New Zealand Qualifications Authority (NZQA) |
| Subject | 20061 Terminate High Voltage Polymeric Insulated Power Cables up to 22kV in the Electricity Supply Industry |
US 20061 Assignment Brief
| Unit standard | 20061 |
| Title | Terminate high voltage polymeric insulated power cables up to 22kV in the electricity supply industry |
| Level | 4 |
| Credits | 10 |
| Classification | Electricity Supply > Electricity Supply – Distribution Networks |
Purpose
People credited with this unit standard are able to terminate high voltage polymeric insulated power cables up to 22kV in the electricity supply industry.
Outcomes and Performance Criteria
Outcome 1
Terminate high voltage polymeric insulated power cables up to 22kV in the electricity supply industry.
Range – evidence of three workplace activities is required.
Performance criteria
1.1Â Work site is prepared, and a safe working zone is established.
Range – scope of work, identification and testing of cables, tools and equipment.
1.2Â Terminations are prepared.
Range – cleaning, conductor preparation, stripping, earthing.
1.3 Conductors are terminated.
Range –  compression, mechanical, moisture management.
1.4 Conductors are re-insulated.
Range -may include but is not limited to – barrier, elastomer, heat shrink, tapes, resins; evidence of two is required.
1.5Â Mechanical and environmental integrity and earth continuity are re-established.
1.6Â Terminations are mounted in enclosures.
Range – below ground, above ground.
1.7Â Cables are tested after termination.
Range – includes but is not limited to – HV pressure testing, insulation, phase testing to manufacturers’ specifications.
1.8Â Termination as built is recorded to asset owner standards.
Range – includes but is not limited to – location, test results.
Get Expert Help With Unit Standard 20061 Assignment
Hire NZ Native Experts 24/7.
Are you also finding it difficult to complete your 20061 terminate high voltage polymeric insulated power cables up to 22kV in the electricity supply industry assignment? Many students struggle with cable termination procedures, workplace safety requirements, testing standards, technical documentation, and meeting NZQA assessment criteria. NZ Assignment Help has supported students with similar technical assignments through expert-written solutions. You can also explore our electrical engineering assignment help and  engineering assignment answers. If you need a well-structured solution that meets your assessment requirements, take our help me with an assignment.
- SCIE707 Research Project Proposal and Cultural Safety & Engagement Statement Assessment 2026 | AUT
- CA ANZ Tax (NZ) Assessment 1 Case Study Term 4 2026: Hume & Hearth Ceramics Limited
- BILD 361 Project Management Assessment 2, 2026: BIM Residential Project Management Plan | VUW
- SARC 321 Construction Assignment 3 2026: Envelope, Gantt Chart and Site Logistics Plan | Victoria University of Wellington
- LAWCOMM 782 Trade Mark Practice Letter of Advice 2026 | University of Auckland
- LAWCOMM 795 Copyright and Design Final Assessment 2026 | University of Auckland
- BSNS5202 Advanced Business Information Assessment 3, 2026 | Open Polytechnic
- BSNS5203 Applied Business Technologies Assessment 2, 2026 | Open Polytechnic
- CONS7822 Industry Project Part 2 Assessment 4 – Final Report 2026
- HEAL865 Health Research Design and Planning Assessment 2, 2026