| University | University of Auckland (UOA) |
| Subject | CON103: Contract Administration and Valuing Building Works |
Learning outcomes
This assessment covers the following learning outcomes:
LO1: Identify and apply the communication and administrative processes for the construction phase.
LO2: Prepare progress claims and provide costs for work executed, prepare and present costs of variations, prepare and present cost fluctuations, prepare and present time extension claims.
Task 1: Variations
a. Explain the purpose of variations. Use a bullet list.
b. For each of the following situations identify whether a variation between the client and the main contractor exists. Include a brief explanation to support each of your answers and state who pays for the variation.
1. Your company proceeded with procurement of the subcontract trades in the three weeks prior to the start-up meeting. Knowing that the architect wasn’t issuing the For Construction documents until the start-up meeting, you requested the structural steel subcontractor to immediately commence the shop drawings, based on the tender issue documents. You are hoping to mitigate any delay to the program from the late issue of the For Construction documents. When you do review the For Construction drawings you notice that there is additional steel along the north elevation. You contact the structural steel subcontractor about this, and they advise that they have already completed the shop drawings for that section of the building and will need to redo the drawings.
Stuck! Do not Know Assessment Answers?
Hire NZ Native Experts 24/7.
2. Setout of the phase 1 building is completed, and the excavation of the footings has begun. Rather than boxing the large foundation pads, your company has decided to pour the concrete ‘to the country’, which will save time and costs as the formwork labor and materials are deleted. The engineer has approved this method of construction.
3. You have received a variation price request that changes the materials to be used for lining the distribution warehouse
c. Identify the six major components that make up the pricing of a variation.
d. In a cost-reimbursement contract when could a variation be claimed?
e. Other than Section 9 of NZS 3910:2013, what other sections relate to pricing changes to the contract price? Provide the section number and a brief description of the section subject.
f. Carefully read each of the contract instruction extracts, consider the information provided. For each contract, instruction prepares a variation ready for submission to the ETC.
Buy Custom Assignment & Homework Solutions
Pay to NZ Native Writers | Cheap Cost & Plag Free
If you need an assignment completed by an assignment writer NZ. Get in touch with the Auckland assignment help service if you need help. There is a lot of writing services online that promise to be able to help with your management assignment, but how do you know which one to use?
- Nursing Assignment 3 : Factors that Impact Registered Nurses’ Ability to Influence National Government Health Policy
- The Management and Behaviour or Pregnant Sows on Pasture Assignment 1 | Massey University (MU)
- HAS 962 – Occupational Hygiene: Measurement Assessment 4 AIOH Technical Report | UOW
- IT00143 Install & Optimize Software Applications Assignment | Pacific Polytech
- Digital Tourism and Hospitality Assignment Report | Auckland University of Technology
- HEAL840 Critical Enquiry for Evidence Based Practice Additional Assessment Opportunity (AAO) Semester 1 2025
- RES903 Research Dissertation Assessment One | Nelson Marlborough Institute of Technology (NMIT)
- 71338 Managing Change Assessment 3 Strategy and Implementation Report | Open Polytechnic
- BSRV4601 Fundamentals Real Estate Assignment 1: Eligibility and licensing | Open Polytechnic (OP)
- MGMT801 Managing in a Multi-Cultural Environment Assignment 1 Report, Auckland Institute Of Studies (AIS) New Zealand

