BSNS4601 Assessment 1
Weighting
25%
Learning outcome
1. Contribute to a project communication plan to meet project requirements.
2. Support the achievement of team objectives for the development of a project.
3. Describe a project, its life cycle stages, and project management processes.
Instructions
Complete and submit your assessment according to the Open Polytechnic’s Assessments webpage. This includes information on academic integrity, formatting, word limits and referencing.
- Include your name, student number and the assessment number.
- Number your pages.
Submission
- Submit your assessment in one file.
- Submit your work through your iQualify course.
- Emailed assessments will not be accepted.
- You will receive an automated notice advising you of your successful submission.
Assessment Overview
Projects, stakeholders, and communication The aim of this assessment is for you to apply your project management knowledge to assess a scenario. You will then prepare a stakeholder analysis and communication plan based on thescenario provided. These tasks will be based on the Tōtara papa tākaro scenario provided below.This will demonstrate your ability to select and use appropriate project management tools andtechniques to communicate effectively, manage project risk, achieve project objectives throughself-management and collaboration and comply with internal and external requirements.Your assessment includesthree(3) tasks and there isone(1) submission point.All tasks should be completed using the template provided (Assessment 1 Template).
Tōtara papa tākaro
scenario
He papa tākaro hou mō Tōtara – new destination playground for Tōtara
Background
Tōtara is a small town in provincial New Zealand. The Mayor, Tui Walters, has proposed that thetown rebuild its community playground.An employee of the local council, John Williams, has been appointed as the project manager.
Your job is to assist John in managing this project, which will involve much consultation with thecommunity and other interested parties, and you are familiar with this community. John Williams isnew to the area and has recently relocated his family to Tōtara from Auckland. There are manydecisions yet to be made, and many different opinions on the way forward for this project.
Other council employees who will be involved in the project are Fred Campbell, the Health andSafety (H&S) Advisor, and Jane Te Hui, the Procurement Manager.
Fred has a strong background inH&S and is considered an expert in this field. He came to Tōtara 10 years ago and has manycontacts in the community. Jane is responsible for all procurement activities, including paperworkand authorisations. The project will be overseen at a high level by the mayor.The existing playground is outdated and is not always large enough for the groups who use it (suchas school or community group outings).
It costs too much to maintain, especially because it needsresurfacing, and the equipment and facilities are outdated. It is also currently based on an oldurupā (Māori burial site). Therefore, a new site must be found and the original site will be clearedof all the old equipment and returned to local iwi. This must be completed before work commenceson the new site. Several different sites were proposed by council, business people, and communitygroups. However, the council has now decided to use another unused piece of land they alreadyown, which is one acre in size.
The projectThe mayor and her team want to create a modern destination playground that merges in with thelandscape, has a connection with the land and stories and people of Tōtara, and is a great source ofentertainment for local children and visitors.The exact specifications for the playground are yet to be determined and agreed upon. This is oneof the things that needs to be done as soon as possible as part of the consultation plan. Safety is ofthe utmost importance.The council has an expectation that this whole project will be completed 12 months from now andhave set a budget of $1,500,000.
The funding is to come from the local council (60%) as well asfrom fundraising by community groups (40%).
The minimum specifications include the following.
- The theme of the playground needs to have a connection with the land and the local peopleand culture. Local iwi and other community groups will be involved in finalising the theme.
- The playground must cater to people with disabilities by providing suitable equipment. Thisis separate from the equipment listed below.
- The surfacing needs to be robust, H&S approved, environmentally friendly, and within abudget of $300,000.
- The playground equipment must be suitable for a range of age groups, for example, ages 2 –5, ages 6 –10, and ages 11 –15.Playground equipment needed is as follows.
- At least 6 swing sets of various sizes.
- At least 6 slides of various sizes combined with climbing frames.
- A commercial splash pad (spray pool) which facilitates water play for children andprovides rich sensory experiences.
- Additional facilities must include toilets, changing rooms, and drinking water.
- Picnic tables and benches must be provided throughout the area, as well as rubbish bins andrecycling bins for plastics and aluminium tins.
- A mobile café will provide onsite coffee and snacks for at least a few hours each day.
Task 1: Project management theory
Use the provided template to complete the following tasks. You will find the templates in theAssessments section of your course (Assessment 1 Template).
Read the given scenario carefully.
Apply your knowledge of project management theory and, withreference to the provided project scenario, address each of the following.
a. Describe why the given scenario is a project rather than business as usual. Include in youranswer at least three (3) characteristics or attributes of the scenario that lead you tobelieve it is a project.
b. State two (2) project goals of the given scenario.
Task 2: Stakeholder analysis
Demonstrate your understanding of stakeholder engagement and management by completing astakeholder analysis matrixfor the Tōtara papa tākaro scenario.Use the Assessment 1 Template tocomplete your answer for this task.
Note: These stakeholders are not only those people shown in the given scenario but will includethose people and organisations that may be required to complete the project. You will need tocreate fictitious information where necessary to complete the templates.
To complete the stakeholder analysis matrix, do the following.
a. Identify five (5) key stakeholders for the given scenario, including individuals who are inmanagement and operational positions.Identify each stakeholder’s role in the project.
b. Complete contact details for each stakeholder.
c. Identify what is important to each stakeholder.d. Identify how each stakeholder contributes to the project.e. Identify how each stakeholder could potentially block the project.f. Provide one (1) strategy for engaging each stakeholder.(Word count guideline: 300 words) (30 marks)
Struggling with BSNS4601 Project Management Assessment at Open Polytechnic?
Hire NZ Native Experts 24/7.
Open Polytechnic students often find BSNS4601 Introduction to Project Management Assessment 1 challenging due to stakeholder analysis, communication planning, and applying theory to real-world scenarios.There is no need to worry, as NZ Assignment Help provides expert project management assignment help aligned with Open Polytechnic assessment standards. For trust, students can review our expert-written management assignment samples. Order your BSNS4601 Assessment 1 today through our online open polytechnic assignment helper and receive 100% original, well-structured work written only for you.
- 32405 Write Texts to Communicate Ideas and Information Assessment 2026 | NZQA
- 32403 Demonstrate Understanding of Ideas and Information in Written Texts Assessment 2026 | NZQA
- ACCTN203 Management Accounting Assignment Brief 2026 | University of Waikato
- Educational Leadership Assessment Learning Outcomes 2026
- MKTG801 Marketing and Enterprise Assignment 3 Brief 2026 | Auckland Institute Of Studies
- 110.209 Intermediate Financial Accounting Assignment 1, 2026 | Massey University
- NURSPRAC 719 Clinical Practice in Mental Health and Addictions Assessment 1, 2026 | UOA
- ACCY5102 Applied Accounting Assessment 1 Trimester 1, 2026 | WITT New Zealand
- NURS753 Te Whakaaroaro mō te Whakahaere Rongoā/Clinical Reasoning for Medication Management Assessment Essay 2026
- BN5.004 Whaiora Summative Assessment One 2026 | Eastern Institute Of Technology